According to the xChange Standard Container Leasing Agreement, sub-clause 7(e):
(e) Post-trip inspections on the redelivery of reefer Equipment shall be conducted by a surveyor appointed by the Supplier.
In other words, the Supplier should complete an inspection after the unit has been dropped off to confirm the container condition is as expected.
Comments
0 commentsPlease sign in to leave a comment.